Movies Like Behind Schedule

Loved Behind Schedule? These 24 movies and shows share its DNA — surfaced by our semantic engine from theme, mood, cast and genre, then ranked by how closely they match. Every pick includes cast, ratings, trailers and streaming options.

Journey to the Center of the Earth 2008 ★ 6.1
Bref 2011 ★ 8.1
Journey to the Center of the Earth 1959 ★ 6.9
Back on Track 2013 ★ 7.3
The Island 2018 ★ 6.7
Trapped 2015 ★ 7.3
The Visitor from the Future 2022 ★ 6.3
Tandem 1987 ★ 7.1
On Tour 2010 ★ 6.4
The International 2006 ★ 6.4
Double Take 2001 ★ 5.5
My Travel Buddy 2017 ★ 6.0
Case départ 2011 ★ 6.0
France 2021 ★ 5.2
Dismissal 2017 ★ 5.0
Get Away 2024 ★ 5.2
Berlin Kaplanı 2012 ★ 4.7
Disclaimer 2019 ★ 4.7
Before Sunset 2004 ★ 7.8
The Man with the Answers 2021 ★ 7.0
Before Midnight 2013 ★ 7.5
Sans Soleil 1983 ★ 7.5
Through the Fire 2018 ★ 7.3
La Jetée 1962 ★ 7.9